BMW 5 Series touring (E 39/2) LHD Manual do Utilizador Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 18
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
EN/10
© BMW Group, Munich Installation Instructions No. 01 29 0 303 576 Issue date: 04.2003
6. To install and connect the navigation system retrofit wiring harness
Connect branches A11 and A12 to on-board
monitor radio H.
Route navigation system retrofit wiring harness
A and GPS aerial cable B along the standard
wiring harness as follows:
- Branches A9, A10 and B2 to the installation
site of the navigation computer
- Branches A7 and A8 to the D pillar on the left
- Branches A1A6 and B1 to the front
Screw branch A8 to earth post X13016.
Cars built before 09/00 only
Unfasten the aerial cables (1) from the aerial
amplifier (2) and tie them back.
Exchange the aerial amplifier (2) for the version
after 09/00.
Connect branch A7 to the aerial amplifier (2).
H
A11
A12
A+B
A1-A6
B2
B1
A9
A8
A7
A10
X13016
A8
1
2
A7
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Comentários a estes Manuais

Sem comentários